EMS portrait for Levion Technologies GmbH
- Company
- Levion Technologies GmbH
- Company headquarters
- Graz, Austria
- Energy management system (EMS)
- SEMS
- Website
- https://www.levion.at/
General information
| Main application | HEMS (Home Energy Management System) |
| main target group |
|
| secondary target group |
|
| Utility service | electricity, heating, water |
| Do Swiss customers belong to your target group? | No, but we serve Swiss customers opportunistically |
Functions for real estate
-
Measurements
Measurements for billingMultitenancy -
Visualisation & Monitoring
Measurement data processing (Reporting, Data disaggregation, Analysis of energy flows)Visualizations (building level or apartment level)Monitoring and operational supervision, Incident managementDemonstrating the potential financial savings for end customersPV performance evaluation -
Control systems
Self-consumption optimization on junction boxE-mobility dynamic load managementE-mobilty Demand-based charging management (Prioritization)E-mobility V2HWeather forecastingSelf-consumption optimization by energy communitiesFlexible prioritization of consumersControl of consumers using dynamic tariffsReceiving ripple control signalsDynamic feed-in regulationRetrieval flexibilitiesActive battery management -
Services
Direct marketingVEWA conform billingZEV billingCollection -
Certificates
SmartGridreadyMETAS certificationMinergie monitoring -
Additional functions
VEWA and ZEV are requirements specifically from the CH market, as SEMS is only running in Austria and Germany, the CH standards have not yet been added.
Offer for utilities
-
Operation
Application in single- & multi-family housesPortfolio overviewMultitenancyIncident managementAuthorization management -
Market needs
E-Mobility billingElectricity tariffs -
Grid needs
Ripple control system replacementReactive current detectionPeak shavingLoad shiftingE-mobility V2GFlexibility aggregation
Specifications
| Interfaces to utility systems |
|
| Commercialisation by utilities |
Yes, with white label under certain conditions |
Compatible Components
Note: The distinction between measurements and controls was introduced with the update in 2026. The company has not updated its data since it was recorded in 2023. Accordingly, previous information has been carried over for both measurements and controls.
| Measurable components | Controllable components | |
|---|---|---|
| Electricity meter |
Standard offer available |
|
| Heat meter |
Individual offer developable |
|
| Water meter |
Individual offer developable |
|
| Gas meter |
Not stated |
|
| Inverter/PV plant |
Standard offer available |
Standard offer available |
| Battery storage |
Standard offer available |
Standard offer available |
| Heat pump |
Standard offer available |
Standard offer available |
| Combined heat and power plant (CHPP) |
Individual offer developable |
Individual offer developable |
| Water boiler |
Standard offer available |
Standard offer available |
| Other heating systems (Heating rods, fossil fuel heaters, etc.) |
Standard offer available |
Standard offer available |
| Heat storage |
Standard offer available |
Standard offer available |
| EV-charging station |
Standard offer available |
Standard offer available |
| Average cost to implement new producers (driver development) |
Wallbox integration of a new manufacturer into our system requires OCPP 1.6 J and is to be calculated with an expenditure of 3'000-5'000 EUR. Otherwise depending on effort |
|
Operating modes Components
-
Charging station
Solar based chargingAffordable chargingPriority chargingConsideration of load limits
-
Heat pump
Dynamic setpoint shiftsForecast-based control
-
Heating rods
Stepless control
Technical information
| Operating elements |
|
| Components of the product |
|
| Interfaces to components |
|
| Communication interfaces | LAN, WLAN |
| Standardized customer interface in accordance with VSE branch directive | Not stated |
| Interface for reading measured values from intelligent measuring systems | Not stated |
| Integration of third-party systems to influence hardware | Standard offer available |
| Control and regulation mechanisms | Algorithms (consideration of several factors) |
| Control of components | Centrally in a control box (local) |
Intervals for data measurement and transmission
| Data measurement for control | depends on the interface |
| Data measurement for electricity billing | Other |
| Data measurement for heat billing | Other |
| Data measurement for water billing | Other |
| Data measurement for e-mobility billing | Other |
| Data transmission | In real time (up to 5 minutes) |
Installation & Operation
| When purchased via utility | Not stated |
| When purchsed via EMS provider | Installation by Specialist partner, externer Installateur |
| When purchased via wholesale | Installation by Specialist partner, externer Installateur |
| Duration of installation at the end customer | project-specific |
| Software updates | At least 4 times a year |
| Software updates - Through EMS provider | Manual on site, Manually via remote access |
| Software updates - Through specialist partner | Not stated |
| Software updates - Through utilities | Not stated |
| Warranty | 2 years |
| Lifetime | 9 years |
Data protection and IT security
| Data storage | Locally at the client's site |
| Certification of Cloud solution | No certification |
Costs
These are rough estimates. An offer must be requested for exact cost information.
The following use case was assumed for the cost estimate:
1 single-party building with the following existing components (excluding commercial use):
- Metering units: 1 electricity meter
- 1 photovoltaic system (with 1 inverter) with battery storage
- 1 heat pump (SG-Ready)
- 1 hot water boiler (relay control)
- 1 fully equipped charging station (AC charging)
These are rough estimates. An offer must be requested for exact cost information.
The following use case was assumed for the cost estimate:
1 multi-unit building with the following existing components (excluding commercial premises):
- Metering units: 20 electricity meters
- 1 photovoltaic system (with 1 inverter) with battery storage
- 1 heat pump (SG-Ready)
- 1 hot water boiler (relay control)
- 20 parking spaces, 5 of which are fully equipped with charging stations (AC charging)
Functions (fulfilled)
Functions (fulfilled)
Functions (not fulfilled)
Functions (not fulfilled)
| Single-party building | |
|---|---|
| Comment | |
| One-time hardware costs | Not stated |
| One-time software costs | Not stated |
| Total of one-time costs | Not stated |
| Installation cost | Not stated Not stated |
| Project management costs | Not stated |
| Annual costs | Not stated |
| Multi-unit building | |
|---|---|
| Comment | |
| One-time hardware costs | EUR 7,800 excl. 20 % VAT Hardware incl. small material |
| One-time software costs | EUR 6,500 Initial installation up to 10 charging points |
| Total of one-time costs | EUR 14,300 |
| Installation cost | Not stated |
| Project management costs | EUR 3,500 |
| Annual costs | EUR 750 excl. VAT Per charging point EUR 12.50 |
| Deviation/discounts for portfolio with 100 buildings (per building) | Not stated |
Information about the company
| Establishment in Switzerland | No, but we are interested in entering the Swiss market in the future |
| Do you already work together with utilities? |
Yes
With whom, or how many: Energie Steiermark, with Feistritzwerke we had a research project |
| Other partners/clients | Kostad Steuerungselemente GmbH, M-TEC, homee GmbH, DiniTech, LG Electronics, VARTA, KOSTAL Solar Electric GmbH, My-PV GmbH, KEBA AG, go-e GmbH, SMA Solar Technology AG, SolarEdge Technologies Inc., sonnen GmbH, Fronius International GmbH, MEC electronics, Verbund / MEC electronics, myStrom AG, Aeotec, Danfoss, Danfoss, Fibar Group S.A., Goap d.o.o. Nova Gorica, Z-Wave Europe GmbH, EUROTRONIC Technology GmbH, Heatit Controls AB, NodOn (ID-RF), Devolo Home Control, Shenzhen Neo Electronics Co Ltd, GreenWave Reality Inc, permundo GmbH, Popp / Duwi (Reitz-Group.de), Horstmann, Philio Technology Corp, NorthQ, (these are our main partners; the list is constantly growing) |
| Number of installations in Switzerland | 0 |
| Number of installations in Europe (excl. Switzerland) | we have only installations in Austria and in Germany |
| Founding year | 2014 |
| Number of FTE | Not stated |