EMS portrait for Energis
- Company
- Energis
- Company headquarters
- Louvain-la-Neuve, Belgium
- Energy management system (EMS)
- Energis.Cloud
- Website
- https://energis.cloud/
General information
| Main application | HEMS (Home Energy Management System) |
| main target group |
|
| Utility service | electricity, heating, water |
| Do Swiss customers belong to your target group? | Yes, they belong to our main target group |
| Other target groups | Retail |
Functions for real estate
-
Measurements
MultitenancyMeasurements for billing -
Visualisation & Monitoring
Monitoring and operational supervision, Incident managementMeasurement data processing (Reporting, Data disaggregation, Analysis of energy flows)Visualizations (building level or apartment level)Demonstrating the potential financial savings for end customersPV performance evaluation -
Control systems
Weather forecastingE-mobilty Demand-based charging management (Prioritization)Self-consumption optimization on junction boxE-mobility dynamic load managementE-mobility V2HSelf-consumption optimization by energy communitiesFlexible prioritization of consumersControl of consumers using dynamic tariffsReceiving ripple control signalsDynamic feed-in regulationRetrieval flexibilitiesActive battery management -
Services
ZEV billingDirect marketingVEWA conform billingCollection -
Certificates
SmartGridreadyMETAS certificationMinergie monitoring
Offer for utilities
-
Operation
Portfolio overviewMultitenancyIncident managementAuthorization managementApplication in single- & multi-family houses -
Market needs
Electricity tariffsE-Mobility billing -
Grid needs
Ripple control system replacementReactive current detectionFlexibility aggregationPeak shavingE-mobility V2GLoad shifting
Specifications
| Interfaces to utility systems |
|
| Commercialisation by utilities |
Yes, with white label under certain conditions |
Compatible Components
Note: The distinction between measurements and controls was introduced with the update in 2026. The company has not updated its data since it was recorded in 2023. Accordingly, previous information has been carried over for both measurements and controls.
| Measurable components | Controllable components | |
|---|---|---|
| Electricity meter |
Standard offer available |
|
| Heat meter |
Standard offer available |
|
| Water meter |
Standard offer available |
|
| Gas meter |
Not stated |
|
| Inverter/PV plant |
Standard offer available |
Standard offer available |
| Battery storage |
Standard offer available |
Standard offer available |
| Heat pump |
Standard offer available |
Standard offer available |
| Combined heat and power plant (CHPP) |
Standard offer available |
Standard offer available |
| Water boiler |
No offer |
No offer |
| Other heating systems (Heating rods, fossil fuel heaters, etc.) |
Standard offer available |
Standard offer available |
| Heat storage |
Individual offer developable |
Individual offer developable |
| EV-charging station |
Standard offer available |
Standard offer available |
| Average cost to implement new producers (driver development) |
Not stated |
|
Operating modes Components
-
Charging station
Solar based chargingAffordable chargingPriority chargingConsideration of load limits
-
Heat pump
Dynamic setpoint shiftsForecast-based control
-
Heating rods
Stepless control
Technical information
| Operating elements |
|
| Components of the product |
|
| Interfaces to components |
|
| Communication interfaces | GSM, WLAN |
| Standardized customer interface in accordance with VSE branch directive | Not stated |
| Interface for reading measured values from intelligent measuring systems | Not stated |
| Integration of third-party systems to influence hardware | Individual offer developable |
| Control and regulation mechanisms | If-Then Functions, Algorithms (consideration of several factors), AI (self-learning algorithms, etc.) |
| Control of components | Centrally in a control box (local) |
Intervals for data measurement and transmission
| Data measurement for control | In real time (up to 5 seconds) |
| Data measurement for electricity billing | Every 15 minutes |
| Data measurement for heat billing | Daily |
| Data measurement for water billing | Daily |
| Data measurement for e-mobility billing | Hourly |
| Data transmission | Every 15 minutes |
Installation & Operation
| When purchased via utility | Not stated |
| When purchsed via EMS provider | Installation by End user, EMS provider, Specialist partner, utility, other partners |
| When purchased via wholesale | Not stated |
| Duration of installation at the end customer | project-specific |
| Software updates | At least 4 times a year |
| Software updates - Through EMS provider | Automatic process |
| Software updates - Through specialist partner | Not stated |
| Software updates - Through utilities | Not stated |
| Warranty | 99 years |
| Lifetime | Not stated |
Data protection and IT security
| Data storage | Cloud - in Europe, outside of Switzerland |
| Certification of Cloud solution | ISO 27001 |
Costs
These are rough estimates. An offer must be requested for exact cost information.
The following use case was assumed for the cost estimate:
1 single-party building with the following existing components (excluding commercial use):
- Metering units: 1 electricity meter
- 1 photovoltaic system (with 1 inverter) with battery storage
- 1 heat pump (SG-Ready)
- 1 hot water boiler (relay control)
- 1 fully equipped charging station (AC charging)
These are rough estimates. An offer must be requested for exact cost information.
The following use case was assumed for the cost estimate:
1 multi-unit building with the following existing components (excluding commercial premises):
- Metering units: 20 electricity meters
- 1 photovoltaic system (with 1 inverter) with battery storage
- 1 heat pump (SG-Ready)
- 1 hot water boiler (relay control)
- 20 parking spaces, 5 of which are fully equipped with charging stations (AC charging)
Functions (fulfilled)
Functions (fulfilled)
Functions (not fulfilled)
Functions (not fulfilled)
| Single-party building | |
|---|---|
| Comment | |
| One-time hardware costs | Not stated |
| One-time software costs | Not stated |
| Total of one-time costs | Not stated |
| Installation cost | Not stated Not stated |
| Project management costs | Not stated |
| Annual costs | Not stated |
| Multi-unit building | |
|---|---|
| Comment | |
| One-time hardware costs | EUR 15,000 Maximum |
| One-time software costs | EUR 15,000 Maximum |
| Total of one-time costs | EUR 50,000 Maximum |
| Installation cost | Not stated |
| Project management costs | EUR 120 per hour |
| Annual costs | EUR 15,000 maximum |
| Deviation/discounts for portfolio with 100 buildings (per building) | 40'000-200'000 EUR |
Information about the company
| Establishment in Switzerland | No, but we are interested in entering the Swiss market in the future |
| Do you already work together with utilities? |
No
|
| Other partners/clients | keine |
| Number of installations in Switzerland | Not stated |
| Number of installations in Europe (excl. Switzerland) | 30 000 sites |
| Founding year | 2017 |
| Number of FTE | 20 |