EMS portrait for meo ENERGY GmbH
- Company
- meo ENERGY GmbH
- Company headquarters
- Graz, Austria
- Energy management system (EMS)
- PROPILOT
- Website
- https://www.meo-energy.com/
General information
| Main application | HEMS (Home Energy Management System) |
| main target group |
|
| secondary target group |
|
| no application |
|
| Utility service | electricity, heating |
| Do Swiss customers belong to your target group? | Yes, they belong to our main target group |
| Other target groups | Energy service company |
Functions for real estate
-
Measurements
MultitenancyMeasurements for billing -
Visualisation & Monitoring
Monitoring and operational supervision, Incident managementMeasurement data processing (Reporting, Data disaggregation, Analysis of energy flows)Visualizations (building level or apartment level)Demonstrating the potential financial savings for end customersPV performance evaluation -
Control systems
Self-consumption optimization on junction boxE-mobility dynamic load managementE-mobilty Demand-based charging management (Prioritization)Weather forecastingE-mobility V2HSelf-consumption optimization by energy communitiesFlexible prioritization of consumersControl of consumers using dynamic tariffsReceiving ripple control signalsDynamic feed-in regulationRetrieval flexibilitiesActive battery management -
Services
Direct marketingVEWA conform billingZEV billingCollection -
Certificates
SmartGridreadyMETAS certificationMinergie monitoring -
Additional functions
Simple operating optimization for existing heating systems
Offer for utilities
-
Operation
Application in single- & multi-family housesPortfolio overviewMultitenancyIncident managementAuthorization management -
Market needs
E-Mobility billingElectricity tariffs -
Grid needs
Peak shavingLoad shiftingE-mobility V2GFlexibility aggregationRipple control system replacementReactive current detection -
Further utility services
Optimization of existing heating systems
Specifications
| Interfaces to utility systems |
|
| Commercialisation by utilities |
Yes, with white label as standard |
| Further advantages for utility |
Can be requested from our B2B distribution partner Buehler Expert Advisors GmbH |
Compatible Components
Note: The distinction between measurements and controls was introduced with the update in 2026. The company has not updated its data since it was recorded in 2023. Accordingly, previous information has been carried over for both measurements and controls.
| Measurable components | Controllable components | |
|---|---|---|
| Electricity meter |
Standard offer available |
|
| Heat meter |
Standard offer available |
|
| Water meter |
Standard offer available |
|
| Gas meter |
Not stated |
|
| Inverter/PV plant |
Standard offer available |
Standard offer available |
| Battery storage |
Standard offer available |
Standard offer available |
| Heat pump |
Standard offer available |
Standard offer available |
| Combined heat and power plant (CHPP) |
Standard offer available |
Standard offer available |
| Water boiler |
Standard offer available |
Standard offer available |
| Other heating systems (Heating rods, fossil fuel heaters, etc.) |
Standard offer available |
Standard offer available |
| Heat storage |
Standard offer available |
Standard offer available |
| EV-charging station |
Standard offer available |
Standard offer available |
| Other components |
All older fossil fuel heating systems |
|
| Average cost to implement new producers (driver development) |
3'500 CHF |
|
Operating modes Components
-
Charging station
Solar based chargingAffordable chargingPriority chargingConsideration of load limits
-
Heat pump
Dynamic setpoint shiftsForecast-based control
-
Heating rods
Stepless control
Technical information
| Operating elements |
|
| Components of the product |
|
| Interfaces to components |
|
| Communication interfaces | GSM, LAN, Powerline, WLAN |
| Standardized customer interface in accordance with VSE branch directive | Not stated |
| Interface for reading measured values from intelligent measuring systems | Not stated |
| Integration of third-party systems to influence hardware | Individual offer developable |
| Control and regulation mechanisms | AI (self-learning algorithms, etc.) |
| Control of components | Centrally in a control box (cloud) |
Intervals for data measurement and transmission
| Data measurement for control | In real time (up to 5 seconds) |
| Data measurement for electricity billing | In real time (up to 5 seconds) |
| Data measurement for heat billing | Every 15 minutes |
| Data measurement for water billing | Every 15 minutes |
| Data measurement for e-mobility billing | In real time (up to 5 seconds) |
| Data transmission | In real time (up to 5 minutes) |
Installation & Operation
| When purchased via utility | Installation by EMS provider, Specialist partner, utility, externer Installateur, other partners |
| When purchsed via EMS provider | Not stated |
| When purchased via wholesale | Not stated |
| Duration of installation at the end customer | 2 - 5 hours |
| Software updates | Not stated |
| Software updates - Through EMS provider | Automatic process |
| Software updates - Through specialist partner | Not stated |
| Software updates - Through utilities | Not stated |
| Warranty | 3 years |
| Lifetime | 10 years |
Data protection and IT security
| Privacy Policy Overview | State of the art security and privacy |
| Data storage | Locally at the client's site, Cloud - in Switzerland, Cloud - in Europe, outside of Switzerland |
| Certification of Cloud solution | Not stated |
Costs
These are rough estimates. An offer must be requested for exact cost information.
The following use case was assumed for the cost estimate:
1 single-party building with the following existing components (excluding commercial use):
- Metering units: 1 electricity meter
- 1 photovoltaic system (with 1 inverter) with battery storage
- 1 heat pump (SG-Ready)
- 1 hot water boiler (relay control)
- 1 fully equipped charging station (AC charging)
These are rough estimates. An offer must be requested for exact cost information.
The following use case was assumed for the cost estimate:
1 multi-unit building with the following existing components (excluding commercial premises):
- Metering units: 20 electricity meters
- 1 photovoltaic system (with 1 inverter) with battery storage
- 1 heat pump (SG-Ready)
- 1 hot water boiler (relay control)
- 20 parking spaces, 5 of which are fully equipped with charging stations (AC charging)
Functions (fulfilled)
Functions (fulfilled)
Functions (not fulfilled)
Functions (not fulfilled)
| Single-party building | |
|---|---|
| Comment | |
| One-time hardware costs | Not stated |
| One-time software costs | Not stated |
| Total of one-time costs | Not stated |
| Installation cost | Not stated Not stated |
| Project management costs | Not stated |
| Annual costs | Not stated |
| Multi-unit building | |
|---|---|
| Comment | |
| One-time hardware costs | CHF 5,500 |
| One-time software costs | CHF 0 |
| Total of one-time costs | CHF 5,500 |
| Installation cost | Not stated |
| Project management costs | CHF 0 |
| Annual costs | CHF 690 |
| Deviation/discounts for portfolio with 100 buildings (per building) | 20% discount from 50 pieces / 30% discount from 100 pieces |
Information about the company
| Establishment in Switzerland | Yes, we are compatible with the Swiss system: currency, tariff system, etc. |
| Do you already work together with utilities? |
Yes
With whom, or how many: AEW Aarau |
| Other partners/clients | General importer for Switzerland: Buehler Expert Advisors GmbH |
| Number of installations in Switzerland | 350+ buildings |
| Number of installations in Europe (excl. Switzerland) | 500+ buildings |
| Founding year | 2014 |
| Number of FTE | 12 |